• aa building permit.jpg
  • building permit melbourne 1.jpg
  • building permit victoria.jpg
  • building surveyor melbourne a.jpg
  • z building surveyor.jpg

Building Permits

"We're proud to be one of Victoria's longest existing and largest servicing building surveyors with extensive metropolitan and rural coverage."

Enquiries welcome

Shed Permit Requirements Guide

Do I need a permit for a shed in Victoria?

As required with any building structure, constructing a shed or garage may also require a permit. Shed or garage permit requirements vary according to location. Shed permits are necessary if the structure applies to any of the following:

  • More than 2.4m in height, or

  • Larger than 10m2 in area, or

  • Closer than 1m to a boundary, or

  • Attached to another building or structure

Do you need a permit to build a shed in your backyard?

For many regions, a building permit is required for outdoor structures that exceed a certain height. It is important to enquire about your local region’s criteria for obtaining a building permit for a shed. In most regions, installing a 6x8 or 8x8 shed will meet most building code requirements.

Other things to note when constructing a shed or garage:

  • Domestic sheds and garages in Victoria will often require a building permit. A registered building practitioner is required if the construction of the shed requires a building permit, includes supply and installation, is of a higher cost than $10,000, and you are not an owner-builder.

  • Domestic building insurance is required if the cost of work, materials and labour exceeds $16,000.

  • For work costing over $10,000, a major domestic building contract must be logged with the registered building practitioner. 

  • Any installation of flashings, roof sheeting, guttering and other regulated plumbing work on a shed must be done through a registered or licensed plumbing practitioner.

 

Want to know exactly how much your permit will cost? – Request a quote today

Please submit your contact details and specifics of your project to receive a response from one of our staff. For most quotes, please allow up to 24 hours for a response. Larger projects are typically processed within 48 hours.

If you have not received a response within that time, please do not hesitate to contact us again!